|
|
|
Title
|
Date
|
Location
|
Hours
|
Current Courses |
| CD -ROM Performance Development of Reciprocating Internal Combustion Engines K447 |
Jul 1, 2008-Jun 30, 2009 | online |
0 |
| Power System Analysis Skills for Engineers and Technicians J865 |
Oct 6-8, 2008 | Madison, WI |
20 |
| Managing Snow and Ice Control Operations K119 |
Oct 6-7, 2008 | Madison, WI |
12 |
| Traffic Engineering Fundamentals K206 |
Oct 6-8, 2008 | Madison, WI |
21 |
| Designing Bio/Infiltration Best Management Practices for Storm Water Quality Improvement K214 |
Oct 6-7, 2008 | Madison, WI |
12 |
| Inventory Management and Procurement for MRO K222 |
Oct 6-7, 2008 | Madison, WI |
14 |
| Engineer in Transition to Management K228 |
Oct 6-8, 2008 | Madison, WI |
21 |
| Art and Science of Industrial Mixing K204 |
Oct 7-9, 2008 | Madison, WI |
21 |
| Planning and Implementing Microwave Radio for Next Generation Networks K230 |
Oct 7-9, 2008 | Madison, WI |
17 |
| Introduction to Ammonia Refrigeration Systems J454 |
Oct 8-10, 2008 | Madison, WI |
20 |
| Improving Intersection Safety and Efficiency K207 |
Oct 9-10, 2008 | Madison, WI |
15 |
| Successfully Installing Total Productive Maintenance J381 |
Oct 13-14, 2008 | Madison, WI |
12 |
| Design of Geothermal Systems for Water Source Heat Pumps and Central Systems J426 |
Oct 13-16, 2008 | Madison, WI |
32 |
Advanced Steady Flow Modeling Using HEC-RAS 4.0 K290 |
Oct 13-14, 2008 | Las Vegas, NV |
14 |
Introduction to Electric Motors and Power Transformers: Applications and Principles of Operation K308 |
Oct 13-16, 2008 | Madison, WI |
27 |
| Value -Stream and Time-Based Process Mapping J810 |
Oct 14-16, 2008 | Madison, WI |
20 |
| Fundamentals of Wind Power Plant Design J953 |
Oct 14-17, 2008 | Madison, WI |
25 |
| Storm Sewer System Design J977 |
Oct 14-15, 2008 | Las Vegas, NV |
14 |
| Electrical Grounding of Communications Systems K231 |
Oct 14-16, 2008 | Madison, WI |
18 |
| Establishing an Effective Preventive/Predictive Maintenance Program J382 |
Oct 15-16, 2008 | Madison, WI |
12 |
| Docks and Marinas 2008 J908 |
Oct 15-17, 2008 | Madison, WI |
20 |
| Using HEC-RAS to Compute Water Surface Profiles for Floodplains, Bridge and Culvert Hydraulics J972 |
Oct 15-17, 2008 | Las Vegas, NV |
21 |
| Evaporators: Designing, Evaluating and Operating K218 |
Oct 15-16, 2008 | Madison, WI |
14 |
| Fundamentals of Lighting Efficiency K266 |
Oct 15-Nov 19, 2008 | online |
12 |
| Storm Water Detention Basin Design J976 |
Oct 16-17, 2008 | Las Vegas, NV |
14 |
Using Foundry Sand in Transportation and Civil Infrastructure Applications K479 |
Oct 16-Nov 20, 2008 | online |
8 |
| Selecting and Operating Boiler Plants for Central Heating or Process Systems J427 |
Oct 20-24, 2008 | Madison, WI |
40 |
| 5S /Visual Management J747 |
Oct 20-22, 2008 | Madison, WI |
18 |
| Computerized Transmission Line Design: PLS-CADD Hands-On Training J866 |
Oct 20-24, 2008 | Madison, WI |
34 |
| Test Method Validation in Pharmaceutical and Biopharmaceutical Development and Production J991 |
Oct 20-22, 2008 | Las Vegas, NV |
18 |
| Selecting and Operating Boiler Plants for Central Heating or Process Systems J427 |
Oct 20-24, 2008 | Madison, WI |
40 |
| Designing Electrical Overhead Distribution Lines J414 |
Oct 21-23, 2008 | Madison, WI |
20 |
Freight Railroads: Best Operating Practices K111 |
Oct 21-22, 2008 | Madison, WI |
13 |
| Solids Handling: Bins, Feeders, and Pneumatic Conveying Systems k185 |
Oct 21-24, 2008 | Madison, WI |
28 |
| Understanding and Troubleshooting VoIP Networks K232 |
Oct 21-22, 2008 | Madison, WI |
14 |
| Planning, Executing and Sustaining Continuous Improvement Projects J748 |
Oct 22-24, 2008 | Madison, WI |
18 |
| Maintenance Management: Organization and Systems K223 |
Oct 22-23, 2008 | Madison, WI |
14 |
| 54th Madison Thermoset Molding Conference J122 |
Oct 23-24, 2008 | Madison, WI |
12 |
| Cross -Connection Control and Backflow Prevention J829 |
Oct 27-31, 2008 | Madison, WI |
40 |
| Design of Transmission Lines, Structures and Foundations J867 |
Oct 27-31, 2008 | Madison, WI |
34 |
| Biopharmaceutical and Pharmaceutical Stability: Current Trends and Best Practices J992 |
Oct 27-28, 2008 | Las Vegas, NV |
12 |
| Structural Design for Non-Structural Engineers K017 |
Oct 27-31, 2008 | Madison, WI |
25 |
| Laser Beam Diagnostics K040 |
Oct 27-29, 2008 | Madison, WI |
21 |
| Legal Aspects of Engineering, Public Works, and Construction K208 |
Oct 27-28, 2008 | Madison, WI |
14 |
| Commissioning Process for Delivering Quality Constructed Projects K410 |
Oct 27-31, 2008 | Madison, WI |
43 |
| Structural Design for Non-Structural Engineers K017 |
Oct 27-31, 2008 | Madison, WI |
25 |
| Mechanical System Design for Green Buildings J937 |
Oct 28-30, 2008 | Madison, WI |
24 |
| Soil Engineering for Roads and Pavements K011 |
Oct 28-29, 2008 | Las Vegas, NV |
14 |
| Predictive Maintenance Technologies K276 |
Oct 28-29, 2008 | Madison, WI |
14 |
| Reinforced Concrete Design K426 |
Oct 28-30, 2008 | Madison, WI |
20 |
| Reinforced Concrete Design K426 |
Oct 28-30, 2008 | Madison, WI |
20 |
Professional Practice Online--Fall 2008: Leading Change in Technical Environments K271 |
Oct 28-Dec 16, 2008 | online |
6 |
| Quick Response Cost Estimating and Quoting K191 |
Oct 29-30, 2008 | Madison, WI |
16 |
| Soil Engineering for Non-Soils Engineers and Technicians K012 |
Oct 30-31, 2008 | Las Vegas, NV |
14 |
| Pavement Design K210 |
Oct 30-31, 2008 | Las Vegas, NV |
15 |
| Laser Welding Certification Refresher K288 |
Oct 30, 2008 | Madison, WI |
5 |
| Laser Welding Certification Exam K289 |
Oct 30, 2008 | Madison, WI |
5 |
| Certification Orientation/Review and Examination for Accredited Commissioning Process Provider K411 |
Oct 31-Nov 1, 2008 | Madison, WI |
5 |
| Municipal Engineering Fundamentals for Non-Engineers J950 |
Nov 3-4, 2008 | Las Vegas, NV |
12 |
| GMPs and Application of Quality Systems to Dietary Supplements: Strategies to Achieve Compliance J993 |
Nov 3-4, 2008 | Las Vegas, NV |
12 |
| Power Electronics: Circuits, Systems and Industrial Applications K088 |
Nov 3-5, 2008 | Madison, WI |
21 |
| 2006 International Building Code for Design Professionals K211 |
Nov 3-4, 2008 | Las Vegas, NV |
15 |
| Preventive Maintenance for Facilities K224 |
Nov 3-4, 2008 | Madison, WI |
14 |
| Powder and Bulk Mixing: Processes, Applications and Equipment K274 |
Nov 3-5, 2008 | Philadelphia, PA |
21 |
| Surge Arrester Application and Insulation Coordination in AC Power Systems K285 |
Nov 3-4, 2008 | Madison, WI |
15 |
| Fundamentals of Substation Equipment and Control Systems J893 |
Nov 5-7, 2008 | Madison, WI |
20 |
| Preparing an Effective Municipal Capital Improvements Plan J974 |
Nov 5-6, 2008 | Las Vegas, NV |
12 |
| Developing and Implementing Effective Pharmaceutical Stability Programs J994 |
Nov 5-6, 2008 | Las Vegas, NV |
12 |
| Role of Warnings and Instructions K007 |
Nov 5-7, 2008 | Madison, WI |
15 |
| Structural Provisions of the 2006 International Building Code K219 |
Nov 5-6, 2008 | Las Vegas, NV |
15 |
Principles and Practices of Mechanical Integrity for Industrial Refrigeration Systems K321 |
Nov 5-7, 2008 | Madison, WI |
20 |
| Fundamentals of Substation Equipment and Control Systems J893 |
Nov 5-7, 2008 | Madison, WI |
20 |
| Sprinkler and Other Automatic Fire Suppression Systems J428 |
Nov 10-14, 2008 | Madison, WI |
40 |
| Principles of Substation Design and Construction J894 |
Nov 10-12, 2008 | Madison, WI |
20 |
| Improving Residential Building Inspection Skills K138 |
Nov 10-11, 2008 | Madison, WI |
16 |
| Sprinkler and Other Automatic Fire Suppression Systems J428 |
Nov 10-14, 2008 | Madison, WI |
40 |
| Achieving Successful Multi-Vendor DDC Systems J510 |
Nov 11-14, 2008 | Madison, WI |
28 |
| Basic Telephony and Digital Switching K331 |
Nov 11-14, 2008 | Madison, WI |
25 |
| Pharmaceutical Laboratory Controls for FDA Compliance: A Systematic Priority-Setting Approach J910 |
Nov 12-13, 2008 | Las Vegas, NV |
12 |
| Performing Residential Building Code Plan Reviews K139 |
Nov 12-13, 2008 | Madison, WI |
15 |
| Tools and Strategies to Maximize Maintenance Performance K225 |
Nov 12-13, 2008 | Madison, WI |
14 |
| Upgrading Your Sanitary Sewer Maintenance Program K465 |
Nov 12-14, 2008 | Durham, NC |
18 |
| Wastewater Treatment Engineering for Nutrient Removal K466 |
Nov 12-13, 2008 | Durham, NC |
14 |
Effective Lean Supply Management K437 |
Nov 13-14, 2008 | Madison, WI |
12 |
| Storm Sewer System Design J892 |
Nov 17-18, 2008 | Madison, WI |
14 |
| Advanced Topics in Power System Protection J898 |
Nov 17-19, 2008 | Madison, WI |
15 |
| Statistical Design of Experiments (DoE) for Pharmaceutical Process R&D and Manufacturing: A Practical Approach K003 |
Nov 17-19, 2008 | Las Vegas, NV |
18 |
| Railway Track Systems: Engineering and Design K202 |
Nov 17-18, 2008 | Sunnyvale, CA |
15 |
| Pumping Equipment and Systems: Selecting, Operating, Maintaining, and Troubleshooting K272 |
Nov 17-18, 2008 | Las Vegas, NV |
14 |
| Drawing and Document Management: Planning, Defining and Implementing Effective Content Management Solutions for Engineering and Architectural Drawings and Documents K311 |
Nov 17-19, 2008 | Las Vegas, NV |
21 |
| Pumping Equipment and Systems: Selecting, Operating, Maintaining, and Troubleshooting K272 |
Nov 17-18, 2008 | Las Vegas, NV |
14 |
| National Electrical Safety Code IEEE C2-2007 J679 |
Nov 18-20, 2008 | Las Vegas, NV |
20 |
| Optimizing Capacity, Lead Time and Inventory J749 |
Nov 18-19, 2008 | Madison, WI |
12 |
| National Electrical Code K166 |
Nov 18-20, 2008 | Madison, WI |
20 |
| Understanding Electrical Area Classification and Hazardous Area Wiring K186 |
Nov 18-19, 2008 | Philadelphia, PA |
14 |
Effectively Managing Technical Teams K293 |
Nov 18-20, 2008 | Madison, WI |
17 |
| Upgrading, Maintaining and Repairing Parking Facilities K454 |
Nov 18-19, 2008 | Madison, WI |
12 |
| National Electrical Code K166 |
Nov 18-20, 2008 | Madison, WI |
20 |
| Storm Water Detention Basin Design J891 |
Nov 19-20, 2008 | Madison, WI |
14 |
| Wide -Area Measurements for Power Systems: Monitoring, Protection and Control J899 |
Nov 19-21, 2008 | Madison, WI |
14 |
| Design Workshop for Wastewater Pumping Systems and Lift Stations K497 |
Nov 19-20, 2008 | Las Vegas, NV |
14 |
| Understanding and Troubleshooting Videoconferencing Networks K227 |
Nov 20-21, 2008 | Las Vegas, NV |
12 |
Active Pharmaceutical Ingredient (API) Crystallization: A Practical Approach to Process Research, Development, and Scale-Up K464 |
Nov 20-21, 2008 | Las Vegas, NV |
12 |
| Physical Plant Engineering Design and Management Review Course J429 |
Dec 1-5, 2008 | Madison, WI |
40 |
| Implementing a Sidewalk Management System J965 |
Dec 2-3, 2008 | Madison, WI |
12 |
| Developing a Climate Change Strategy for Businesses and Public Institutions K544 |
Dec 2-3, 2008 | Lincolnshire, IL |
11 |
| Developing a Climate Change Strategy for Businesses and Public Institutions K544 |
Dec 2-3, 2008 | Lincolnshire, IL |
11 |
| Intermediate Ammonia Refrigeration Systems J455 |
Dec 3-5, 2008 | Madison, WI |
20 |
| Preventive Maintenance and Repair of Buildings and Grounds K498 |
Dec 3-5, 2008 | Madison, WI |
18 |
| Solving Neighborhood Traffic Problems K215 |
Dec 4-5, 2008 | Madison, WI |
15 |
Essentials of Hydraulics for Civil Engineers and Designers K496 |
Dec 4-5, 2008 | Madison, WI |
14 |
Essentials of Hydraulics for Civil Engineers and Designers K496 |
Dec 4-5, 2008 | Madison, WI |
14 |
| Understanding Power Cable Characteristics and Applications J984 |
Dec 8-11, 2008 | Las Vegas, NV |
24 |
| Pharmaceutical and Device Project Management J995 |
Dec 8-10, 2008 | Las Vegas, NV |
16 |
| Highway Bridge Design K013 |
Dec 8-10, 2008 | Madison, WI |
22 |
| Comprehensive Practices for Effective Construction Project Management K018 |
Dec 8-9, 2008 | Madison, WI |
14 |
| Improving Public Works Construction Inspection Skills K118 |
Dec 8-9, 2008 | Las Vegas, NV |
15 |
| Managing Property Maintenance Code Compliance Programs K136 |
Dec 8-9, 2008 | Madison, WI |
15 |
| Improving Property Maintenance Code Inspection and Enforcement Skills K137 |
Dec 8-10, 2008 | Madison, WI |
18 |
| Commissioning Process in Practice: An Intensive Project-Based Course for Providers K294 |
Dec 8-12, 2008 | Orlando, FL |
38 |
| Understanding Power Cable Characteristics and Applications J984 |
Dec 8-11, 2008 | Las Vegas, NV |
24 |
| Comprehensive Practices for Effective Construction Project Management K018 |
Dec 8-9, 2008 | Madison, WI |
14 |
| Principles and Practices of Construction Project Scheduling K019 |
Dec 10, 2008 | Madison, WI |
7 |
| Maintaining Asphalt Pavements K286 |
Dec 10-11, 2008 | Las Vegas, NV |
13 |
| Principles and Practices of Construction Project Scheduling K019 |
Dec 10, 2008 | Madison, WI |
7 |
| Railway Bridge Engineering K014 |
Dec 11-12, 2008 | Madison, WI |
14 |
| Principles and Practices of Estimating for Construction and Design Professionals K020 |
Dec 11-12, 2008 | Madison, WI |
14 |
| Lean Accounting for the Lean Enterprise K421 |
Dec 11-12, 2008 | Madison, WI |
14 |
| Certification Orientation/Review and Examination for Accredited Commissioning Process Provider K295 |
Dec 12-13, 2008 | Orlando, FL |
5 |
| Cleaning Validation Practices for Pharmaceutical and Biopharmaceutical Production J996 |
Dec 15-16, 2008 | Las Vegas, NV |
12 |
| Low Slope Roofing Systems-Built-up, Polymer-modified Bitumen, Single Ply, Metal and Polyurethane Foam Roofs K501 |
Dec 15-17, 2008 | Madison, WI |
18 |
| Cross -Connection Control and Backflow Prevention K081 |
Jan 5-9, 2009 | Madison, WI |
40 |
Scale -up Methods for Liquid Mixing Processes K557 |
Jan 13-15, 2009 | Orlando, FL |
21 |
| Process Safety Management Audits K052 |
Jan 14-16, 2009 | Madison, WI |
20 |
| Electrical Systems Design for the Non-Electrical Engineer K278 |
Jan 19-23, 2009 | Orlando, FL |
35 |
| Structural Design of Masonry Systems K016 |
Jan 20-21, 2009 | Madison, WI |
14 |
| Improving Public Works Construction Inspection Skills K098 |
Jan 20-21, 2009 | Madison, WI |
15 |
| Successfully Installing Total Productive Maintenance K422 |
Jan 20-21, 2009 | Las Vegas, NV |
12 |
| Structural Design of Masonry Systems K016 |
Jan 20-21, 2009 | Madison, WI |
14 |
Engineering Executives Forum: A Systems View of Sustainability K006 |
Jan 21-22, 2009 | Madison, WI |
10 |
| Foundation Engineering and Design K417 |
Jan 21-23, 2009 | Madison, WI |
22 |
| Maintaining Asphalt Pavements K117 |
Jan 22-23, 2009 | Madison, WI |
13 |
| Establishing an Effective Preventive/Predictive Maintenance Program K423 |
Jan 22-23, 2009 | Las Vegas, NV |
12 |
| Masonry Design and Construction--How to Avoid and Solve Masonry Problems K499 |
Jan 22-23, 2009 | Madison, WI |
13 |
| Preventing and Detecting Deficiencies in Design and Construction Documents K187 |
Jan 26-28, 2009 | Las Vegas, NV |
20 |
| Power System Analysis Skills for Engineers and Technicians K282 |
Jan 26-28, 2009 | Orlando, FL |
20 |
| Engineer in Transition to Management K310 |
Jan 26-28, 2009 | Las Vegas, NV |
21 |
| Inventory Management and Procurement for MRO K527 |
Jan 26-27, 2009 | Las Vegas, NV |
14 |
| Laser Welding: Equipment and Process Validation K559 |
Jan 26-29, 2009 | Phoenix, AZ |
26 |
| Introduction to Planning and Designing Fiber to the Premises K552 |
Jan 27-28, 2009 | Las Vegas, NV |
14 |
| Maintenance Management: Organization and Systems K519 |
Jan 28-29, 2009 | Las Vegas, NV |
14 |
| Laser Welding Certification Refresher K560 |
Jan 29, 2009 | Phoenix, AZ |
5 |
| Laser Welding Certification Exam K561 |
Jan 30, 2009 | Phoenix, AZ |
5 |
| Building Inspection K140 |
Feb 2-5, 2009 | Madison, WI |
25 |
| Managing Building Inspection Programs K141 |
Feb 4-5, 2009 | Madison, WI |
14 |
| Intellectual Property Protection and Developing Patentable Technology J424 |
Feb 9-10, 2009 | Madison, WI |
15 |
| Commissioning Process for Delivering Quality Constructed Projects K180 |
Feb 9-11, 2009 | Las Vegas, NV |
27 |
| Introductory Principles of Engineering Project Management K188 |
Feb 9-10, 2009 | Las Vegas, NV |
15 |
| Sprinkler and Other Automatic Fire Suppression Systems K456 |
Feb 9-13, 2009 | Orlando, FL |
40 |
| Effective Roadway Lighting K503 |
Feb 9-11, 2009 | Las Vegas, NV |
22 |
| Sprinkler and Other Automatic Fire Suppression Systems K456 |
Feb 9-13, 2009 | Orlando, FL |
40 |
| Achieving Energy Cost Savings for Ammonia Refrigeration Systems K053 |
Feb 11-13, 2009 | Madison, WI |
20 |
| Management Skills for Engineering Capital Projects K189 |
Feb 11-12, 2009 | Las Vegas, NV |
15 |
| Sanitary Landfill Design K302 |
Feb 11-13, 2009 | Madison, WI |
18 |
| Project Management Skills for New Product Development K566 |
Feb 11-12, 2009 | Las Vegas, NV |
15 |
| Commissioning Process for LEED Projects J504 |
Feb 12-13, 2009 | Las Vegas, NV |
16 |
| Commissioning Process for Existing Buildings K181 |
Feb 12-13, 2009 | Las Vegas, NV |
16 |
| Fleet Management - Effective Practices for Public and Private Fleets K325 |
Feb 12-13, 2009 | Las Vegas, NV |
12 |
| Certification Orientation/Review and Examination for Accredited Commissioning Process Provi |