|
|
|
Title
|
Date
|
Location
|
Hours
|
Current Courses |
| HVAC Systems for Industrial Facilities J423 |
Apr 28-May 2, 2008 | Madison, WI |
40 |
| Watershed Modeling Using the New HEC-HMS J490 |
Apr 30-May 2, 2008 | Madison, WI |
21 |
| Kaizen Blitz J744 |
Apr 30-May 2, 2008 | Madison, WI |
18 |
| Preventing Deficiencies in the Design and Construction of Water and Wastewater Projects J797 |
Apr 30-May 2, 2008 | Madison, WI |
18 |
| Preventing Deficiencies in the Design and Construction of Water and Wastewater Projects J797 |
Apr 30-May 2, 2008 | Madison, WI |
18 |
| Fundamentals of Lighting Efficiency J406 |
Apr 30-Jun 4, 2008 | online |
12 |
| Understanding and Troubleshooting Videoconferencing Networks J934 |
May 1-2, 2008 | Madison, WI |
12 |
| Electrical Grounding and Bonding J418 |
May 5-7, 2008 | Madison, WI |
18 |
| Using HEC-RAS to Compute Water Surface Profiles for Floodplains, Bridge and Culvert Hydraulics J489 |
May 5-7, 2008 | Madison, WI |
21 |
| Green Building Process: Real-World Strategies and Tools J578 |
May 5-6, 2008 | Madison, WI |
16 |
| Advanced Practices in Pharmaceutical Tablet and Capsule Technology J726 |
May 5-7, 2008 | Las Vegas, NV |
18 |
| Railway Track Systems: Engineering and Design J778 |
May 5-6, 2008 | Elk Grove Village, IL |
15 |
| Membrane Filtration Technology K008 |
May 5-6, 2008 | Madison, WI |
14 |
| Electrical Grounding and Bonding J418 |
May 5-7, 2008 | Madison, WI |
18 |
| Green Building Process: Real-World Strategies and Tools J578 |
May 5-6, 2008 | Madison, WI |
16 |
| Membrane Filtration Technology K008 |
May 5-6, 2008 | Madison, WI |
14 |
| Electrical Distribution Principles and Applications J410 |
May 6-8, 2008 | Madison, WI |
20 |
| Pilot Plant and Laboratory Safety J862 |
May 6-8, 2008 | Madison, WI |
20 |
Introduction to Predictive Maintenance Technologies J964 |
May 6-7, 2008 | Madison, WI |
14 |
| Precast and Prestressed Concrete Structures: Understanding The Characteristics for Design, Production, and Construction J922 |
May 7-8, 2008 | Madison, WI |
14 |
| Precast and Prestressed Concrete Structures: Understanding The Characteristics for Design, Production, and Construction J922 |
May 7-8, 2008 | Madison, WI |
14 |
| Preparing an Effective Municipal Capital Improvements Plan J488 |
May 8-9, 2008 | Madison, WI |
12 |
| Infection Control in Healthcare Facilities J817 |
May 8-9, 2008 | Madison, WI |
14 |
| Introductory Principles of Engineering Project Management J466 |
May 12-13, 2008 | Madison, WI |
13 |
| 2006 International Building Code for Design Professionals J693 |
May 12-13, 2008 | Madison, WI |
15 |
| Soil Engineering for Roads and Pavements J928 |
May 12-13, 2008 | Madison, WI |
14 |
| Dynamic Reactive Power Control J650 |
May 13-16, 2008 | Madison, WI |
21 |
| Engineering Calculations for Process Safety Management and Risk Management Planning J841 |
May 13-15, 2008 | Madison, WI |
18 |
| Evaporators: Designing, Evaluating and Operating J952 |
May 13-14, 2008 | Madison, WI |
14 |
Managing Your Maintenance Program J954 |
May 13-14, 2008 | Madison, WI |
14 |
| Project Management Skills for New Product Development J467 |
May 14-15, 2008 | Madison, WI |
13 |
| Management Skills for Engineering Capital Projects J468 |
May 14-15, 2008 | Madison, WI |
13 |
| Structural Provisions of the 2006 International Building Code J694 |
May 14-15, 2008 | Madison, WI |
15 |
| Project Management for Electric Utility Capital Projects J914 |
May 14-15, 2008 | Madison, WI |
13 |
| Computer Tools for Engineering Project Management J469 |
May 16, 2008 | Madison, WI |
7 |
| Chilled Water Plants for Central Cooling Systems J422 |
May 19-23, 2008 | Madison, WI |
40 |
| Energy Modeling for High-Performance Buildings J683 |
May 19-20, 2008 | Madison, WI |
20 |
| Chilled Water Plants for Central Cooling Systems J422 |
May 19-23, 2008 | Madison, WI |
40 |
| Energy Modeling for High-Performance Buildings J683 |
May 19-20, 2008 | Madison, WI |
20 |
| Value -Stream and Time-Based Process Mapping J808 |
May 20-22, 2008 | Madison, WI |
20 |
| Powder and Bulk Mixing: Processes, Applications and Equipment J857 |
May 20-22, 2008 | Philadelphia, PA |
21 |
| Effective Techniques for Cost Estimation and Economic Evaluation J978 |
May 20-22, 2008 | Madison, WI |
17 |
| Comprehensive Practices for Effective Construction Project Management J470 |
Jun 2-3, 2008 | Madison, WI |
15 |
| Laser Welding: Equipment and Process Validation J881 |
Jun 2-5, 2008 | Madison, WI |
26 |
| Engineer in Transition to Management J895 |
Jun 2-4, 2008 | Madison, WI |
21 |
| Commissioning Process in Practice: An Intensive Project-Based Course for Providers J962 |
Jun 2-6, 2008 | Madison, WI |
36 |
Statistical Design of Experiments (DoE) for Pharmaceutical Process R&D and Manufacturing: A Practical Approach J997 |
Jun 2-3, 2008 | Las Vegas, NV |
12 |
| Fundamentals of Drinking Water Treatment K015 |
Jun 2-3, 2008 | Madison, WI |
14 |
| Comprehensive Practices for Effective Construction Project Management J470 |
Jun 2-3, 2008 | Madison, WI |
15 |
| Using HEC-RAS to Compute Water Surface Profiles for Floodplains, Bridge and Culvert Hydraulics K080 |
Jun 3-5, 2008 | Madison, WI |
21 |
| Sanitary Landfill Design K097 |
Jun 3-5, 2008 | Casper, WY |
16 |
| Achieving Successful Multi-Vendor DDC Systems K159 |
Jun 3-6, 2008 | Madison, WI |
28 |
| Principles and Practices of Construction Project Scheduling J471 |
Jun 4, 2008 | Madison, WI |
7 |
| Principles and Practices of Construction Project Scheduling J471 |
Jun 4, 2008 | Madison, WI |
7 |
| Principles and Practices of Estimating for Construction and Design Professionals J472 |
Jun 5-6, 2008 | Madison, WI |
15 |
| Preventive Maintenance For Facilities J756 |
Jun 5-6, 2008 | Madison, WI |
14 |
| Laser Welding Certification Refresher J882 |
Jun 5, 2008 | Madison, WI |
5 |
| Laser Welding Certification Exam J883 |
Jun 6, 2008 | Madison, WI |
5 |
| Certification Orientation/Review and Examination for Accredited Commissioning Process Provider J963 |
Jun 6-7, 2008 | Madison, WI |
5 |
| Modern Power System Protection: Applications and Performance Analysis J651 |
Jun 9-13, 2008 | Madison, WI |
30 |
| Understanding Water Chemistry for Practical Application J795 |
Jun 9-10, 2008 | Madison, WI |
14 |
Introduction to Ergonomics and Human Factors: Coupling Safety and Profits K002 |
Jun 9-11, 2008 | Madison, WI |
17 |
Impact of New FDA Regulatory and Patent Reforms on Pharmaceuticals, Biopharmaceuticals, and Devices K009 |
Jun 9-10, 2008 | Wilmington, DE |
12 |
| Understanding Water Chemistry for Practical Application J795 |
Jun 9-10, 2008 | Madison, WI |
14 |
| Introduction to Data Communications K048 |
Jun 10-12, 2008 | Madison, WI |
17 |
| Fundamentals of HVAC J452 |
Jun 11-13, 2008 | Madison, WI |
20 |
| Designing Wastewater Pumping Systems and Lift Stations J796 |
Jun 11-13, 2008 | Madison, WI |
18 |
| Fire Investigation and Product Liability Litigation J046 |
Jun 12-13, 2008 | Madison, WI |
12 |
| Communications for Power System Protection and Automation J652 |
Jun 16-19, 2008 | Madison, WI |
24 |
| Arc Flash Hazard Analysis J653 |
Jun 18-20, 2008 | Madison, WI |
18 |
| Introduction to Food Chilling and Freezing J822 |
Jun 18-20, 2008 | Madison, WI |
20 |
| Railway Bridge Engineering J933 |
Jun 18-19, 2008 | Philadelphia, PA |
14 |
Building Information Modeling — BIM: Strategies for Implementation J971 |
Jun 23-25, 2008 | Madison, WI |
22 |
Building Information Modeling — BIM: Strategies for Implementation J971 |
Jun 23-25, 2008 | Madison, WI |
22 |
| Streamlining Office Processes with Lean K042 |
Jul 15-16, 2008 | Madison, WI |
12 |
Medium Voltage Cables in Nuclear Power Plants: Characteristics, Performance, Condition Assessment K043 |
Jul 15-17, 2008 | Charlotte, NC |
18 |
Medium Voltage Cables in Nuclear Power Plants: Characteristics, Performance, Condition Assessment K043 |
Jul 15-17, 2008 | Charlotte, NC |
18 |
| Fundamentals of Energy Auditing J885 |
Jul 21-25, 2008 | Madison, WI |
40 |
| Lean Accounting for the Lean Enterprise J987 |
Aug 7-8, 2008 | Madison, WI |
14 |
| Commissioning Process for Delivering Quality Constructed Projects J583 |
Aug 11-13, 2008 | Madison, WI |
27 |
| 2008 EEI Transmission and Wholesale Market School J767 |
Aug 11-15, 2008 | Madison, WI |
32 |
| Structural Steel Design Workshop K183 |
Aug 13-15, 2008 | Madison, WI |
18 |
| Structural Steel Design Workshop K183 |
Aug 13-15, 2008 | Madison, WI |
18 |
| Commissioning Process for LEED Projects J584 |
Aug 14-15, 2008 | Madison, WI |
16 |
| Commissioning Process for Existing Buildings J585 |
Aug 14-15, 2008 | Madison, WI |
16 |
| 8th Mid-Continent Transportation Research Forum J884 |
Aug 14-15, 2008 | Madison, WI |
9 |
| Certification Orientation/Review and Examination for Accredited Commissioning Process Provider J587 |
Aug 15-16, 2008 | Madison, WI |
5 |
Permanent Magnet Machines and Drives: Principles, Design and Applications K120 |
Aug 19-21, 2008 | Madison, WI |
21 |
| Design of Ammonia Refrigeration Systems for Peak Performance and Efficiency J453 |
Sep 8-12, 2008 | Madison, WI |
40 |
| Cogeneration Technology J506 |
Sep 8-12, 2008 | Madison, WI |
40 |
| Pilot Plant Design, Construction and Operation K184 |
Sep 8-10, 2008 | Philadelphia, PA |
20 |
| Cogeneration Technology J506 |
Sep 8-12, 2008 | Madison, WI |
40 |
| Underground Electrical Distribution Systems J411 |
Sep 9-11, 2008 | Madison, WI |
20 |
| Lean Enterprise J809 |
Sep 9-11, 2008 | Madison, WI |
20 |
| Energy Modeling for High-Performance Buildings J935 |
Sep 9-10, 2008 | Madison, WI |
20 |
| Wastewater Treatment Plants: Processes, Design and Operation K063 |
Sep 9-11, 2008 | Madison, WI |
20 |
| Introduction to Right-of-Way for Utility Engineers, Technicians and Managers K134 |
Sep 9-10, 2008 | Madison, WI |
14 |
| Water Entry Prevention and Moisture Control in Buildings - Roofing Systems, Exterior Walls and Foundations K192 |
Sep 9-10, 2008 | Madison, WI |
12 |
| Energy Modeling for High-Performance Buildings J935 |
Sep 9-10, 2008 | Madison, WI |
20 |
| 20th Annual Product Liability Conference J725 |
Sep 10-12, 2008 | Madison, WI |
15 |
| Fire Protection Systems for Industrial Type Buildings and Processes J425 |
Sep 15-17, 2008 | Madison, WI |
20 |
| Introductory Principles of Engineering Project Management J886 |
Sep 15-16, 2008 | Madison, WI |
13 |
| Storm Water Detention Basin Design J891 |
Sep 15-16, 2008 | Madison, WI |
14 |
| Green Building Process: Real-World Strategies and Tools J936 |
Sep 15-16, 2008 | Madison, WI |
16 |
| Engineering Fundamentals of Rail Freight Terminals, Yards, and Intermodal Facilities: Current Practices in Design and Construction J942 |
Sep 15-16, 2008 | Philadelphia, PA |
14 |
| Chemical Engineering for Non-Chemical Engineers K041 |
Sep 15-17, 2008 | Philadelphia, PA |
21 |
| Fire Protection Systems for Industrial Type Buildings and Processes J425 |
Sep 15-17, 2008 | Madison, WI |
20 |
| Green Building Process: Real-World Strategies and Tools J936 |
Sep 15-16, 2008 | Madison, WI |
16 |
| Management Skills for Engineering Capital Projects J888 |
Sep 17-18, 2008 | Madison, WI |
13 |
| Project Management Skills for New Product Development J889 |
Sep 17-18, 2008 | Madison, WI |
13 |
| Storm Sewer System Design J892 |
Sep 17-18, 2008 | Madison, WI |
14 |
| Fundamentals of Railway Train Control and Signaling Systems J943 |
Sep 17-18, 2008 | Philadelphia, PA |
14 |
| Computer Tools for Engineering Project Management J890 |
Sep 19, 2008 | Madison, WI |
7 |
| Testing, Adjusting and Balancing J507 |
Sep 22-26, 2008 | Madison, WI |
40 |
| DDC Controls J508 |
Sep 22-26, 2008 | Madison, WI |
40 |
| Electrical Systems Design for the Non-Electrical Engineer J864 |
Sep 22-26, 2008 | Madison, WI |
35 |
| Preventing and Detecting Deficiencies in Design and Construction Documents: Buildings and Site Improvement Projects K021 |
Sep 22-24, 2008 | Madison, WI |
20 |
| Designing and Constructing Sanitary Sewer Systems K064 |
Sep 22-24, 2008 | Madison, WI |
20 |
| Dryer Technology K194 |
Sep 22-23, 2008 | Madison, WI |
13 |
| Business, Demand and Operations Planning: Strategies for Make-to-Order and Make-to-Stock Companies J745 |
Sep 23-24, 2008 | Madison, WI |
12 |
| Coordination of Industrial and Commercial Electric Power Distribution Systems J897 |
Sep 23-26, 2008 | Madison, WI |
24 |
| Basics of Industrial Engineering J961 |
Sep 24-26, 2008 | Madison, WI |
21 |
| Atomization and Spray Technology K193 |
Sep 24-25, 2008 | Madison, WI |
13 |
| Auditing Suppliers to the Pharmaceutical Industry J990 |
Oct 1-2, 2008 | Las Vegas, NV |
12 |
| Innovative Fish Passage at Culverts K203 |
Oct 1-3, 2008 | |
15 |
| Geothermal Systems for Water Source Heat Pumps and Central Systems J426 |
Oct 6-8, 2008 | Madison, WI |
24 |
| Power System Analysis Skills for Engineers and Technicians J865 |
Oct 6-8, 2008 | Madison, WI |
20 |
| Managing Snow and Ice Control Operations K119 |
Oct 6-7, 2008 | Madison, WI |
12 |
| Traffic Engineering Fundamentals K206 |
Oct 6-8, 2008 | Madison, WI |
21 |
| Art and Science of Industrial Mixing K204 |
Oct 7-9, 2008 | Madison, WI |
21 |
| Introduction to Ammonia Refrigeration Systems J454 |
Oct 8-10, 2008 | Madison, WI |
20 |
| Improving Intersection Safety and Efficiency K207 |
Oct 9-10, 2008 | Madison, WI |
15 |
| Successfully Installing Total Productive Maintenance J381 |
Oct 13-14, 2008 | Madison, WI |
12 |
| Storm Sewer System Design J977 |
Oct 13-14, 2008 | Las Vegas, NV |
14 |
| Value Stream and Time Based Process Mapping J810 |
Oct 14-16, 2008 | Madison, WI |
20 |
| Fundamentals of Wind Power Plant Design J953 |
Oct 14-17, 2008 | Madison, WI |
25 |
| Establishing an Effective Preventive/Predictive Production Maintenance Program J382 |
Oct 15-16, 2008 | Madison, WI |
12 |
| Docks and Marinas 2008 J908 |
Oct 15-17, 2008 | Madison, WI |
20 |
| Using HEC-RAS to Compute Water Surface Profiles for Floodplains, Bridge and Culvert Hydraulics J972 |
Oct 15-17, 2008 | Las Vegas, NV |
21 |
| Storm Water Detention Basin Design J976 |
Oct 15-16, 2008 | Las Vegas, NV |
14 |
| Selecting and Operating Boiler Plants for Central Heating or Process Systems J427 |
Oct 20-24, 2008 | Madison, WI |
40 |
| 5S /Visual Management J747 |
Oct 20-22, 2008 | Madison, WI |
18 |
| Computerized Transmission Line Design: PLS-CADD Hands-On Training J866 |
Oct 20-24, 2008 | Madison, WI |
34 |
| Test Method Validation in Pharmaceutical and Biopharmaceutical Development and Production J991 |
Oct 20-22, 2008 | Las Vegas, NV |
18 |
| Selecting and Operating Boiler Plants for Central Heating or Process Systems J427 |
Oct 20-24, 2008 | Madison, WI |
40 |
| Designing Electrical Overhead Distribution Lines J414 |
Oct 21-23, 2008 | Madison, WI |
20 |
Freight Railroads: Best Operating Practices K111 |
Oct 21-22, 2008 | Madison, WI |
13 |
| Solids Handling: Bins, Feeders, and Pneumatic Conveying Systems K185 |
Oct 21-24, 2008 | Madison, WI |
28 |
| Planning, Executing and Sustaining Continuous Improvement Projects J748 |
Oct 22-24, 2008 | Madison, WI |
18 |
| 54th Madison Thermoset Molding Conference J122 |
Oct 23-24, 2008 | Madison, WI |
12 |
| Psychrometrics and Load Calculations for Effective Selection of Air Conditioning Systems J509 |
Oct 27-31, 2008 | Madison, WI |
40 |
| Cross -Connection Control and Backflow Prevention J829 |
Oct 27-31, 2008 | Madison, WI |
40 |
| Design of Transmission Lines, Structures and Foundations J867 |
Oct 27-31, 2008 | Madison, WI |
34 |
| Biopharmaceutical and Pharmaceutical Stability: Current Trends and Best Practices J992 |
Oct 27-28, 2008 | Las Vegas, NV |
12 |
| Structural Design for Non-Structural Engineers K017 |
Oct 27-31, 2008 | Madison, WI |
25 |
| Laser Beam Diagnostics K040 |
Oct 27-29, 2008 | Madison, WI |
21 |
| Structural Design for Non-Structural Engineers K017 |
Oct 27-31, 2008 | Madison, WI |
25 |
| Mechanical System Design for Green Buildings J937 |
Oct 28-30, 2008 | Madison, WI |
24 |
| Soil Engineering for Roads and Pavements K011 |
Oct 28-29, 2008 | Las Vegas, NV |
14 |
| Introduction to Intellectual Property and Patent Protection J424 |
Oct 29-31, 2008 | Madison, WI |
15 |
| Quick Response Cost Estimating and Quoting K191 |
Oct 29-30, 2008 | Madison, WI |
16 |
| Soil Engineering for Non-Soils Engineers and Technicians K012 |
Oct 30-31, 2008 | Las Vegas, NV |
14 |
| Municipal Engineering Fundamentals for Non-Engineers J950 |
Nov 3-4, 2008 | Las Vegas, NV |
12 |
| GMPs and Application of Quality Systems to Dietary Supplements: Strategies to Achieve Compliance J993 |
Nov 3-4, 2008 | Las Vegas, NV |
12 |
| Power Electronics: Circuits, Systems and Industrial Applications K088 |
Nov 3-5, 2008 | Madison, WI |
21 |
| Fundamentals of Substation Equipment and Control Systems J893 |
Nov 5-7, 2008 | Madison, WI |
20 |
| Preparing an Effective Municipal Capital Improvements Plan J974 |
Nov 5-6, 2008 | Las Vegas, NV |
12 |
| Developing and Implementing Effective Pharmaceutical Stability Programs J994 |
Nov 5-6, 2008 | Las Vegas, NV |
12 |
| Role of Warnings and Instructions K007 |
Nov 5-7, 2008 | Madison, WI |
15 |
| Fundamentals of Substation Equipment and Control Systems J893 |
Nov 5-7, 2008 |